My Photos
This is the third in the Dome series. The first 24 photos were taken on 11/11/07. I will be trying to keep this page updated as more progress is made on the dome
Welcome Page
 
The garage downstairs showing its expanse. Soon the ceiling will be completed
The downstairs living room, The flaky airform centre door are remnamnts of concrete spray
The no 3 bedroom which is downstairs and did not have a light on for the photo.
The downstairs hallway
View from a bedroom into its shower room
Stairs from ground floor to middle floor
The upper section of the stairs
The hall at the top of the stairs, showing the ladder going to top floor, soon to be a spiral staircase
In the small bedroom on middle floor
View into bathroom of main bedroom
View in the rest of main bedroom
View into den on middle floor, and to the airform where the door to balcony will be
Window space in den which will provide light in the stairwell
A dark photo in the large livingroom
Another dark photo in the livingroom
The top floor room, with temporary windows
This room will be carpeted this week. Photos this page taken on 11/11/07
View west from temp window on top floor
The dome showing some temporary windows 11/11/07
April 2008
In Living room on middle floor
April 2008
Spiral stair from middle to top floor
My small office on middle floor
Living on middle floor
June 2008
Front door about May 2008
Ballan train station opposite the dome.
Visitors from the RMIT alternative energy class.
More of them. They visited in about October 2008.
Dome photos